the backstory

SLAM provided planning, design, pre-construction, estimating and construction management for a 35,000 SF freestanding ambulatory surgery center that features six orthopedic ORs with complete on-site sterile processing, a distinctive 26 bay Pre / Post-op area, pain management, business offices and a welcoming, double height reception and lobby area that initiates a carefully planned patient experience that extends throughout the facility.

at-a-glance

TYPE:
New Surgery Center
PRACTICE:
Architecture
Construction Management
Design Build
Interior Design
Landscape Architecture
Pre-Construction Services
Programming & Planning
Structural Engineering
LOCATION:
Hartford, CT
STATUS:
Completed November 2019
SIZE:
35,000 SF
INSIGHT

The joint venture of Trinity New England-Saint Francis Hospital, Lighthouse Surgeons (a group of orthopedic and spine surgeons) and Woodland Anesthesiology Associates were looking to build a new outpatient orthopedic surgery center that could meet the needs of a growing patient population. They were looking for a free standing facility that was designed for the specific and unique requirements of orthopedic & spine surgery and related pain management, under one roof, in a same-day care setting close to the St. Francis Hospital campus. The building site presented several challenges including existing facilities relocations, poor soils, abatement and drainage.

SOLUTION

SLAM worked closely with the clients to coordinate the many stakeholder needs and keep the project running smoothly and within budget. The integration of design and construction allowed for innovation, flexibility and responsiveness during the construction process resulting in the early delivery of the project. Early phasing included site enabling, abatement and occupant relocation during the approval period. The design and construction also incorporated the utilization of pre-fabricated steel wall panels which allowed framing fabrication to proceed concurrently with the foundation installation, expediting the schedule by six weeks.

SLAM Integrated Services
Transforming the Future of the Healthcare Built Environment
IMPACT

SLAM’s collaborative team planned, designed and constructed a beautiful, efficient and patient-centered out-patient surgery facility that was within budget, ahead of schedule and provides future flexibility for the Health Network, Hospital and physicians group.