Groton Middle School

the backstory

The new 155,000 SF middle school is designed for 950 students in grades 6 through 8 was the first of three school projects for the coastal district. Two middle schools, located on opposite ends of town, were consolidated to bring together students of varying demographic and socioeconomic backgrounds, and combine their respective themes under one roof. The new Groton Middle School follows the International Baccalaureate Middle Years Programme and includes STEM & Arts and Humanities pathways. 

at-a-glance

TYPE:
New Building
PRACTICE:
Design Build
Interior Design
Programming & Planning
Structural Engineering
LOCATION:
Groton, CT
STATUS:
Completed 2020
SIZE:
155,000 SF
INSIGHT

Our challenge was to transform the site to fit Groton Public Schools’ academic and facility needs for the school. The design had to integrate a safe and healthy environment for learning while providing flexible, educational environments that promote tomorrow’s teaching and collaborative learning activities.

SOLUTION

SLAM worked closely with Groton Public Schools to ensure their academic and facility goals were met. The new school provides hands- on and simulated learning spaces to support engaged learning, exterior learning space that ties to the architecture and organization of the building, and improved access to technological tools for faculty and students throughout the building.

[image]

Floor level design themes of sea, land, sun and sky are inspired by the building’s shoreline location.

[image]

Interior color by floor is implemented as wayfinding with inspirational super-graphics in key locations.

[image]

Common spaces integrate all four colors, representing inclusivity of the entire student body.

IMPACT

Sustainability Design Features:

  • Protection of wetlands and natural habitat for endangered bird species on existing site
  • Storm water management (retention ponds and underground storage)
  • Thermally efficient building envelope: Walls R-25 and Roof R-50
  • Ventilation with 100% outside air, CO2 monitoring and heat recovery
  • Chilled beams with conventional boiler/chiller plant 
  • Ice storage production during off-peak hours for reducing peak demand electrical charges for chiller operation
  • Automated lighting controls with low lighting power density for maximum efficiency
  • Windows to maximize daylighting and views to exterior
  • Low-flow plumbing fixtures consuming 20% less water  

The project exceeds Connecticut’s High Performance Building Standards, achieving LEED Gold equivalent.